1. Home
  2. Equipment
  3. Permanent Way Maintenance Equipment
  4. Automatic Rail Loading Device (Model LDPY-100)

Automatic Rail Loading Device (Model LDPY-100)

The LDPY-100 is used during the process of railway construction to load and transport rails. The equipment performs raw material feeding of 15m~100m rails. The rail loading of two production lines can be done by one single operator.

  • Product Features
  • The rail-shifting car will match the rail automatically when the track seeking instruction is selected.
  • High level of automation. The machine can move and load any single rail from 25m to 100m in length prior to welding.
  • The railway construction equipment can move up to 7 rails from the first zone to the second zone as well as automatically move the single rail onto the rail loading line.
  • The equipment can straighten steel rail during the loading process to save time and effort.
  • The intelligent equipment monitors the moving position of the rail-shifting car to ensure the car walks to the required position.
  • The interactive interface achieves synchronous control of the 8 rail-shifting cars by touch screen control.
  • The track building machinery features an emergency stop protection function to protect the equipment, workers, and installation site.
  • Market Performance
  • 3 railway bureaus have purchased and run this device.
  • Technical Parameters
  • Working temperature: -25℃~+80℃, humidity: <95%
  • Rail length lifting range: ≤100m
  • Distance between adjacent cars: about 12m
  • Lifting capacity of single car: 1.5T
  • Weight of single car: About 600kg
  • Horizontal position detection accuracy: ±5mm
  • Vertical positioning accuracy: ± 2mm
  • Position detection sensing range: 0mm~200 mm
  • Total power supply: 380V ± 10%, 50Hz, three-phase five wire system, input power: 9.9kVA
  • Automatic rail lifting success rate: ≥99%
  • Single rail loading time: 1-2 minutes